null

January 27th 2025 Update

2025 Jan 27th

2010-16 Genesis Coupe Shift Kits

We're back to work today on these kits. The CNC is still not perfect, but its good enough that we can continue production this week of the Short Shifters. Today was a bit hectic with shipping out some rush orders this morning prior to getting into the machine shop. However, we did finish the first operation of all of the additional kits that was added last second. Tomorrow we'll be finishing the additional locking caps and moving onto operation #2. As long as everything goes smooth that portion will be finished tomorrow and there's 1 operation left and these parts will be finished and coated.

1234.jpg

 

Subframe Collar Kits

Once we have finished manufacturing the Shift Kits this week, we're going to machine a limited run of our ATQ Collar kits, please be advised that we can't drop everything we're doing 5x a week to make these. So when ordering outside of a production run, it will take 1-2 weeks or less to receive, earlier if the order comes in just prior to manufacturing.

This concludes today's update, a follow up update on the Shifters will be posted tomorrow afternoon.